Get Quote
Language
YOUR POSITION:Home > Support > FAQ > Toilet Paper Machine FAQ >

How Is a Toilet Paper Production Line Installed and Commissioned?

Author:Double Machinery Manufacturer TIME:2026-09-11

Q: What should be prepared before the toilet paper production line arrives?
A: The customer should prepare sufficient floor space, power, compressed air, lifting equipment, raw materials and suitable access for unloading.

Q: How are the rewinder, log saw and packing machine connected during installation?
A: The machines are positioned and connected according to the confirmed line layout, product flow and interface requirements.

Q: Can an engineer support commissioning at the customer’s factory?
A: On-site commissioning can be arranged according to the destination, equipment scope and agreed service terms.

Need Help?
Please leave your contact information to get our latest catalog
Get In Touch Now >
Double Machinery

Tel: +86 139 0819 6540

Email: info@doubletissuemachine.com

MP/WhatsApp: +86 139 0819 6540

Manufacturer Address:Dongguan, Guangdong, China

NEW KEYWORD

About Us

Products

Information