Hand Towel Stack Alignment Before Packing
For hand towel production, inspect folded stack alignment before the packing handoff. Define an acceptable stack shape and check whether transfer preserves that arrangement.
| DOUBLE Custom Configuration | |
| Matched to destination power standard; final voltage and installed power confirmed with the configuration | |
| Configured to the target line output and process balance | |
| Final dimensions issued after product, output and automation scope are confirmed | |
| Folded hand towel paper | |
| Confirmed with the selected machines and finished-product sample | |
| Confirmed where pneumatic cutting, transfer or packing units are included | |
| Confirmed with the final line scope and layout | |
| Specified for the destination-market safety requirements |
The DB-N-225-based automatic hand towel production line links folding, stack transfer, log cutting and full-seal packing into one coordinated flow. Equipment and conveyor connections are matched to your towel specification, package size and factory layout, so the folding, cutting and packing stages stay balanced rather than running as separate islands.
The line follows a defined sequence: paper feeding and folding, stack transfer, rotation and turnover, log cutting, product distribution, full-seal packing and finished-pack conveying. Each stage is set to keep product flow organized and to match the agreed production target. Because the stages are mechanically linked, the practical output of the line is governed by the slowest stage in the chain, not by any single machine running at its own maximum.

The folding unit converts parent roll into folded hand towel stacks. Web tension at this stage, parent-roll quality and fold pattern settings determine how evenly the stacks are formed before they enter transfer and cutting. Confirmed folding output and finished towel dimensions are listed in the Technical Specifications field.

The log saw cuts folded logs to the finished towel length. Cutting accuracy, blade condition and the feeding system affect cut quality and how cleanly the cut stacks transfer to the packing section. The cutting configuration is confirmed against your finished towel format and the factory proposal.

The packing unit forms and seals the refill pack. Film or bag specification, forming mold and sealing parameters are set to suit your package size and the packing material you intend to run. Confirmed packing speed and package size range are listed in the Technical Specifications field.

Before the line is finalized, several configuration decisions determine how the folding, cutting and packing stages connect:
Confirmed machine parameters, including folding output, cutting speed, packing speed, packing size range and installed power, are listed in the Technical Specifications field. Final values are confirmed against the factory proposal.
The line produces folded commercial hand towels in sealed refill packs for hotels, offices, restaurants and public washrooms. Towel dimensions, fold pattern, sheet count and dispenser compatibility are confirmed using your sample, so the finished pack fits the dispensers your customers actually use.
Stable running depends on consistent parent-roll quality, correct web tension at the folding stage, and clean transfer of stacks into the cutting and packing sections. Operators should have clear access to the folding unit, the cutting unit and the packing unit for routine checks, film or bag changes and jam clearing. Planning spare parts and wear items for the cutting and sealing sections before commissioning helps reduce unplanned stops once the line is in production.
Send your towel sample or finished towel dimensions, fold pattern, sheet count per pack, package size, target output, factory layout and local voltage. These inputs let us match the folding, cutting, transfer and packing stages correctly.
Finished-pack output depends on sheet count per pack and on the balance between the connected stages. The folding and packing units each have their own working range, and the practical line output is set by how those stages are matched to your product.
Towel dimensions, fold pattern and dispenser compatibility are confirmed using your sample. Where a different format is required, the cutting configuration and transfer sections are adjusted accordingly.
Layout, cutting configuration, utilities and packing-machine quantity are confirmed before order. Final technical values are agreed against the factory proposal.
Send us your towel sample, package specification, output target and factory layout, and we will prepare a matched folding, cutting, transfer and packing solution. Contact us by WhatsApp or submit the inquiry form for a fast factory response.
Hand Towel Production Line · Download Tissue Paper Cutting Machine Catalog
| Line Model | DB-N-225-Based Hand Towel Production Line |
|---|---|
| Finished Tissue Product | Folded paper hand towel |
| Folding Output | 600–900 sheets/min, according to the factory proposal |
| Cutting Unit | DB-L-150C; final configuration confirmed against the factory proposal |
| Cutting Speed | 20–180 cuts/min, depending on cutting requirements |
| Packing Unit | DB-HT-45P |
| Packing Speed | 40–45 packs/min, depending on package size |
| Packing Size Range | L190–240 × W90–210 × H40–80 mm; selected combinations subject to confirmation |
| Power Supply / Installed Power | 380 V, 50 Hz; total installed power confirmed with final configuration |
Line scope, module combination, and acceptance values are confirmed against the approved factory proposal. For the folding unit, cutting unit, and packing unit details, see the DB-N-225 Hand Towel Folding Machine and the Tissue Paper Cutting Machine Catalog.
To prepare a quotation, share the finished hand towel size, parent roll or input specification, target output, packing format, factory layout, and local voltage. Contact us by WhatsApp or submit the inquiry form for a fast factory response.
For hand towel production, inspect folded stack alignment before the packing handoff. Define an acceptable stack shape and check whether transfer preserves that arrangement.
Map hand towel forming, primary packing and secondary packing as connected stages. Confirm the proposed scope and define how operators should communicate between handoff points.
Check whether hand towel folds retain their intended shape while moving toward packing. Use a clear visual reference to identify stacks requiring closer inspection.
Evaluate a hand towel line using a representative production routine. Check stack condition at packing and finished pack presentation throughout the proposed sequence.
Plan common hand towel inspection points for converting and packing operators. Agree how to flag a stack needing attention before it moves into the next station.
Evaluate the condition of folded and cut hand towels after transfer. Check stack alignment at the packing infeed rather than assessing the transfer section in isolation.
Review the proposed sequence from hand towel cutting through transfer to packing. Confirm responsibilities at each handoff and check whether the material path is easy to monitor.
When planning a hand towel line, trace material from converting through secondary packing. Confirm that operators can monitor movement and coordinate the handoff at each stage.
Plan operator coverage for hand towel folding and packing around the expected material flow. Review where extra inspection may be needed if stack movement becomes uneven.
No reviews yet.