Get Quote
Language
YOUR POSITION:Home > Support > Installation Guide >

Tissue Machine Installation Checklist for New Customers

Author:Double Machinery Manufacturer TIME:2026-09-04

MENU

Tissue Machine Installation Checklist for New Customers

Installing a tissue converting machine requires careful preparation and systematic checking. This checklist helps new customers confirm the key items before installation, during machine setup, and before trial production. Use it as a quick reference when your tissue machine is ready for installation.

Before Installation

  • Machine arrival inspection completed
  • Packing list checked
  • Technical documents received
  • Installation space prepared
  • Power supply ready
  • Air supply ready
  • Floor condition confirmed
  • Installation tools prepared
  • Responsible contact assigned

Mechanical Installation

  • Machine placed in the planned position
  • Machine frame checked
  • Machine leveled
  • Main components installed
  • Rollers and transmission parts checked
  • Belts, chains and guards installed
  • Fasteners checked and tightened
  • Moving parts checked manually where applicable

Electrical & Pneumatic

  • Electrical cabinet checked
  • Electrical connections completed
  • Cable routing checked
  • Control panel checked
  • Sensors checked
  • Motors checked
  • Air pipes connected
  • Pneumatic components checked
  • Air pressure adjusted according to machine requirements

Safety Check

  • Safety guards installed
  • Emergency stop buttons checked
  • Warning labels checked
  • Operator area kept clear
  • No loose tools or foreign objects left on the machine
  • Installation team confirms the machine is safe for testing

Before Trial Production

  • No-load test completed
  • Machine running direction checked
  • Abnormal noise or vibration checked
  • Raw materials prepared
  • Packaging materials prepared if needed
  • Operators trained on basic operation
  • Maintenance points explained
  • Trial production plan confirmed

Need Installation Support?

If you are not sure whether your tissue machine is ready for installation or trial production, contact DOUBLE Machinery. Our technical team can help you review the checklist and guide you through the next steps.

Get Better Quote Please FillIn The Correct Tel & E-mail,We'll Contact You As Soon As Possible!

Need Help?
Please leave your contact information to get our latest catalog
Get In Touch Now >
Double Machinery

Tel: +86 139 0819 6540

Email: info@doubletissuemachine.com

MP/WhatsApp: +86 139 0819 6540

Manufacturer Address:Dongguan, Guangdong, China

NEW KEYWORD

About Us

Products

Information