After a tissue converting machine is installed, trial production is the next important step before regular operation. The goal is to confirm that the machine can run safely, smoothly and produce acceptable finished tissue products. This guide lists the key points customers should check before starting trial production.

1. Confirm Machine Installation

Before testing, make sure the main machine parts are installed correctly. Check whether the machine is leveled, guards are in place, fasteners are tightened and no tools or foreign objects are left inside the working area.

2. Check Electrical and Air Systems

Confirm that the electrical connections, control panel, sensors, motors and pneumatic components have been checked by qualified personnel. Air pressure should be stable if the machine uses pneumatic systems. Do not start trial production if any connection looks abnormal.

3. Run a No-Load Test

A no-load test means running the machine without raw material first. During this test, check the running direction, machine movement, abnormal noise, vibration and emergency stop function. If the machine runs normally without load, the team can prepare for material feeding.

4. Prepare Raw Materials

Prepare suitable parent rolls, packaging film or other materials required for the tissue product. The raw material should match the machine requirements and the target finished product. Poor raw material condition may affect folding, cutting, rewinding or packaging during trial production.

5. Check the First Finished Products

During the first trial production, check the finished tissue appearance carefully. Pay attention to product size, folding effect, cutting edge, roll tightness, embossing quality and packaging condition depending on the machine type. Small adjustments may be needed before stable production.

6. Record Trial Production Results

Record any abnormal noise, unstable movement, material breakage or product quality issue during the test. Share photos or videos with the supplier if support is needed.

Need Help With Trial Production?

If you are preparing for tissue machine trial production, DOUBLE Machinery can help check the machine status, product result and adjustment points before regular operation starts.

Get Better Quote Please FillIn The Correct Tel & E-mail,We'll Contact You As Soon As Possible!

Need Help?
Please leave your contact information to get our latest catalog
Get In Touch Now >
Double Machinery

Tel: +86 139 0819 6540

Email: info@doubletissuemachine.com

MP/WhatsApp: +86 139 0819 6540

Manufacturer Address:Dongguan, Guangdong, China

NEW KEYWORD

About Us

Products

Information